Start-up with or without inoculum? Analysis of an SMBR pilot plant.
2010
This study analysed a submerged membrane bioreactor (SMBR) start-up with the purpose of determining the best conditions to carry it out. In order to do this, a hollow fibre membrane module was installed in a submerged configuration in a pilot aerobic reactor. The experiment was then divided in two phases, lasting 65 days each. During phase 1, the pilot plant was started-up without inoculum of activated sludge and no sludge, withdrawal was performed. Conversely, in phase 2, the MBR pilot plant was started-up with sludge inoculum and the sludge concentration was kept constant. In both phases, the volumetric loading rate applied to the pilot plant was kept constant. The authors analysed the di…
Particle size distribution and biomass growth in a submerged membrane bioreactor
2006
Submerged membrane bioreactors (MBR)associate in a single treatment unit a process ofbiological treatment and a phase of solid/liquidseparation by membrane filtration. Due to reduced membrane porosity, suspendedsolids and large amount of bacteria and virusesmay be retained in the reactor; consequently, highbiomass concentration is generally established inthe system. Indeed, this latter circumstance leadsto obtain a system able to operate with a low F/Mand high SRT and hence, as a result, a low sludgeproduction. In technical literature, the definition of fou-lants in MBR systems is a controversial task.More specifically, the influence of TSS onmixed liquor filterability has not been yet full…